Switch from Stable CART Containing ABA/3TC or TAF/FTC Plus Dolutegravir or Bictegravir to TDF/3TC/doravirine in People Living with HIV: Impact on Lipids, Body Composition, Insulin Sensitivity, Neuroendocrine Function and Inflammation Markers

Status: Terminated
Location: See all (2) locations...
Intervention Type: Drug
Study Type: Interventional
Study Phase: Phase 4
SUMMARY

This is an open label, randomised, two-arm switch study over 48 weeks in which virally suppressed participants on a stable combined ART regimen will be randomised (1:1) to an immediate switch to 3TC/TDF/DOR (immediate switch arm, N=30) for the duration of the 48-week study, or to maintaining their current cART followed by a switch to 3TC/TDF/DOR from week 24-48 (delayed switch arm, N=30). Participants will be monitored for the length of the study (48 weeks) plus a 30-day follow-up period. If patients withdraw or are withdrawn from the study treatment prematurely, an early termination visit (ETV) should occur within 30 days post withdrawal. The hypothesis of the study is that a switch to Delstrigo, which is a combination of tenofovir disoproxil, lamivudine and doravirine (TDF/3TC/DOR) has a favourable impact on lipid metabolism, glucose, weight, body composition and hepatic steatosis.

Eligibility
Participation Requirements
Sex: All
Minimum Age: 18
Healthy Volunteers: f
View:

• HIV-1 infected, 18 years or older

• On stable \& suppressive triple cART containing ABA/3TC or TAF/FTC plus dolutegravir or bictegravir for at least 6 months

• No evidence of resistance to TDF, 3TC, or DOR

• No laboratory abnormalities, medical/psychiatric conditions or alcohol/drug use considered a barrier to participation by investigators

• Women who are of childbearing potential and sexually active need to use the hormonal contraceptive methods, associated with inhibition of ovulation, listed in the protocol:

‣ Implant

⁃ Depot injection

⁃ Intra-uterine device or system

⁃ Oral hormonal contraception A woman is considered of childbearing potential (WOCBP), i.e. fertile, following menarche and until becoming post-menopausal unless permanently sterile. Permanent sterilisation methods include hysterectomy, bilateral salpingectomy and bilateral oophorectomy. A postmenopausal state is defined as no menses for 12 months without an alternative medical cause. A high follicle stimulating hormone (FSH) level in the postmenopausal range may be used to confirm a postmenopausal state in women not using hormonal contraception or hormonal replacement therapy. However in the absence of 12 months of amenorrhea, a single FSH measurement is insufficient.

• Men who are sexually active and have partners who are women of childbearing potential must be using an adequate method of contraception to avoid pregnancy (male condom or sterilisation confirmed prior to the subject's entry into the study)

Locations
Other Locations
United Kingdom
Chelsea and Westminster Hospital NHS Foundation Trust
London
Mortimer Market Centres
London
Time Frame
Start Date: 2023-11-21
Completion Date: 2024-11-21
Participants
Target number of participants: 18
Treatments
Experimental: immediate switch arm
Experimental arm (baseline visit switch group, N=30): One DOR/TDF/3TC tablet taken orally once daily for 48 weeks.~Virally suppressed participants on a stable combined ART regimen will be randomised (1:1) to an immediate switch to 3TC/TDF/DOR (immediate switch arm, N=30) for the duration of the 48-week study, or to maintaining their current cART followed by a switch to 3TC/TDF/DOR from week 24-48 (delayed switch arm, N=30). Participants will be monitored for the length of the study (48 weeks) plus a 30-day follow-up period.
Active_comparator: delayed switch arm
Control arm (deferred switch group, N=30): Participants will continue their current triple cART regimen for 24 weeks, and then switched to taking one TDF/3TC/DOR tablet orally once daily (24 -48 weeks).~Virally suppressed participants on a stable combined ART regimen will be randomised (1:1) to an immediate switch to 3TC/TDF/DOR (immediate switch arm, N=30) for the duration of the 48-week study, or to maintaining their current cART followed by a switch to 3TC/TDF/DOR from week 24-48 (delayed switch arm, N=30). Participants will be monitored for the length of the study (48 weeks) plus a 30-day follow-up period.
Related Therapeutic Areas
Sponsors
Collaborators: Merck Sharp & Dohme LLC
Leads: Chelsea and Westminster NHS Foundation Trust

This content was sourced from clinicaltrials.gov

Similar Clinical Trials