Rapid Start-up of Simultaneous Nitrification and Denitrification Coupled Phosphorus Removal Process and Its Performing Characteristics
In this study, simultaneous nitrification and denitrification (SND) coupled Phosphorus removal process through gradually decreasing DO concentration was investigated by treating wastewater with a low COD/TN ratio (C/N = 3 : 1-4: 1) in a sequencing batch reactor (SBR) inoculated with aerobic granular sludge (AGS). Successful SND coupled Phosphorus phenomenon occurred after 20d at the DO concentration of 0.50-1.0 mg x L(-1). In the following 40 days, the average removal rates of COD, NH4(+) -N, TN and TP were 84.84% , 93.51%, 77.06% and 85.69%, and the NO3(-) -N and NO2(-) -N average accumulations in the effluent were only 4.01 mg x L(-1) and 3.17 mg x L(-1), respectively. The AGS had complete forms and good settling performances, and the sludge volume index (SVI) was about 55.22 mL x g(-1) at the end of starting-up stage. The results of different nitrogen sources showed that the removal rate of TN was in the order of NH4(+) -N > NO2(-) -N > NO3(-) -N, and the removal rate of TP was in the order of NO3(-) -N > NO2(-) -N > NH4(+) -N. The nitrogen and phosphorus removal of wastewater were mainly realized by simultaneous nitrification and denitrification and denitrifying phosphorus removal, respectively.